Quantcast
Channel: SCN: Message List - SAP Adaptive Server Enterprise (SAP ASE) for Custom Applications
Viewing all articles
Browse latest Browse all 3587

Sybase point in time load fails with The specified recovery date in not between error

$
0
0

When I run a sybase point in time load. Backup server reports this error

 

000'The specified recovery date (Nov  5 2014 8:55:00:000AM) is not between the start (Nov  5 2014  7:48:29:530AM) and end (Nov  5 2014  8:52:13:890AM) date.


Where does backup server get this times from?

Are there any tables in sybase server which stores the time when a dump was taken?


Please let me know if there are any views or tables I can check.


Thanks

Shankar


Viewing all articles
Browse latest Browse all 3587

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>