Received following page verification errors in the backup server errorlog.
What are they actually indicating?
What is action need to be taken?
Feb 11 11:12:17 2015: D00: Attempting direct I/O for device '/sybase/PJ2/sybsystem/sybmgmtdb.dat'
Feb 11 11:12:17 2015: Backup Server: 4.188.1.1: Database sybmgmtdb: 6324 kilobytes (8%) DUMPED.
Feb 11 11:12:18 2015: Backup Server: 4.188.1.1: Database sybmgmtdb: 42310 kilobytes (30%) DUMPED.
Feb 11 11:12:18 2015: Backup Server: 4.188.1.1: Database sybmgmtdb: 62648 kilobytes (62%) DUMPED.
Feb 11 11:12:18 2015: D00: Page Verification Error: Object id wrong: alloc page=6912 extent id=6968 page#=6972 ptnid in ext=8 ptnid in page=1712006099.
Feb 11 11:12:18 2015: D00: Page Verification Error: Object id wrong: alloc page=6912 extent id=6968 page#=6973 ptnid in ext=8 ptnid in page=1712006099.
Feb 11 11:12:18 2015: D00: Page Verification Error: Object id wrong: alloc page=6912 extent id=6968 page#=6974 ptnid in ext=8 ptnid in page=1712006099.
Feb 11 11:12:18 2015: D00: Page Verification Error: Object id wrong: alloc page=6912 extent id=6968 page#=6975 ptnid in ext=8 ptnid in page=1712006099.
Feb 11 11:12:18 2015: D00: SYBMULTBUF WARNING: One or more errors have been reported while performing consistency checks on the pages being dumped. The
affected pages will be reread in an attempt to discard spurious errors.
Feb 11 11:12:18 2015: D00: SYBMULTBUF WARNING: After rereading the pages, the consistency check has continued to report one or more errors.
Feb 11 11:12:18 2015: Backup Server: 4.188.1.1: Database sybmgmtdb: 81450 kilobytes (100%) DUMPED.
Feb 11 11:12:18 2015: Backup Server: 3.43.1.1: Dump phase number 1 completed.
Regards,
Rajesh